Wastewater (2014)

Género :

Tiempo de ejecución : 1M

Director : Stephen Broomer

Sinopsis

The North Toronto Wastewater Treatment Plant lies in thick brush downhill from a hydroelectric corridor. The eye bounces, guided by the vertical forms coming up out of the valley, and a low flame bridges these movements.

Actores

Tripulaciones

Stephen Broomer
Stephen Broomer
Director